Installation
   

The 's nutrient removal abliities will exceed many state's evolving regulations.

Designed with the Contractractor in mind, the is easy to install. It comes fully assembled and ready to connect. Simply dig the hole, cement the PVC inlet and outlet lines and install the control panel and pump. A compact footprint means less lot disturbance and smaller excavation equipment requirements.

This series of photographs show how easy is to install.

1) Transport the unit to the site.

2) Set in hole.

3) Connect inlet and outlet lines.
4) Install pump and control panel.

5) Backfill with clean gravel and finish with topsoil.